Welcome to The Metalworks – The Metalworks

Our Information Hub has been created to provide you with a wealth of information regarding The Metalworks, the property and also the surrounding area of Slough.

In order to explore the Information Hub, simply use the tabs above to help you find guidance on appliances and information on how to care for your new property.

Please note: Access to the SevenCapital Information Hub is permitted to tenants, owners and  also lettings agents.

Post Boxes – The Metalworks

Post boxes are located in the reception areas to both blocks within the development.

If you are renting the property and require a replacement post box key, then you will need to contact your landlord or letting agent directly so that they can organise for a replacement to be issued. Replacement post box keys may be chargeable by your landlord or letting agent and you will be responsible for paying the costs incurred for this service.

Windows – The Metalworks

The windows in the property are coated aluminium double-glazed units with lockable handles.

The internal cleaning of the windows is the responsibility of the occupier and must be carried out in a safe manner. The external cleaning of the windows is the responsibility of the Managing Agent, Centrick.

Doors & Ironmongery – The Metalworks

Front Door

The main entrance door to the property is installed in compliance with British Standards and is fire compliant. It has a grey wood veneer finish and is fitted with a British Standard 3 Star Anti Snap Euro Profile Cylinder including a thumb turn and a spy hole for security. Front doors to the property cannot be replaced without seeking advice from the Managing Agent, Centrick, as this could jeopardise the fire integrity of your property.

Please contact the Managing Agent, Centrick for their procedure on how to apply for consent to change the front door to your property.

Internal Doors

The internal doors within the property have a grey wood veneer finish and are fitted with satin finished furniture.

Door Entry System

There is an individual video door entry system within the property that is linked to the main entrance doors to the development, which allows each resident control of visitors into the building. In order to prevent security issues, please do not provide access to anyone who you are not familiar with.

 

Appliances – The Metalworks

The built-in oven, built-in hob, cooker hood, dishwasher, washer-dryer and fridge freezer are controlled by an isolation switch or spur sockets. Please ensure that these are switched on before you attempt to use any of these appliances. Please also ensure that all appliance packaging is removed prior to use.

 

Built-in Oven

The property is fitted with either a Beko or Siemens Built-in Microwave Oven that is covered by a 2-year manufacturer’s warranty. Please see the below PDF versions of the user manuals for guidance, care and maintenance of your appliance:

Download – Built-in Oven – Beko BCW14400 – User Manual

Please see the below links for further troubleshooting information from Beko and Bosch:

www.beko.co.uk/support/how-to-guides/cooking#maintenance

www.bosch-home.co.uk/customer-service/get-support/ovens

All warranty issues should still be logged with SevenCapital.

Built-in Hob

The property is fitted with either a Beko Built-in Hob or Siemens Built-in Induction Hob that is covered by a 2-year manufacturer’s warranty. Please see the below PDF versions of the user manuals for guidance, care and maintenance of your appliance:

Download – Built-in Hob – Beko HIC64102/HCC64103 – User Manual

Download – Built-in Induction Hob – Siemens ED651FSB5E – User Manual

Please see the below links for further troubleshooting information from Beko and Siemens:

www.beko.co.uk/support/how-to-guides/cooking#maintenance

www.siemens-home.bsh-group.com/uk/supportdetail/product/ED651FSB5E/01#/Tabs=section-firstaid/

All warranty issues should still be logged with SevenCapital.

Please Note: It is not recommended to use the hob as an additional workspace, a place of storage or cutting board whilst not in use. This could cause damage and/or scratches to the surface of the hob which would not be covered under the warranty. Induction Hobs also require the appropriate cookware to be used in order for them to operate correctly and to prevent any damage being caused to the appliance.

Cooker Hood

The property is fitted with a Beko Cooker Hood that is covered by a 2-year manufacturer’s warranty. Please see the below PDF version of the user manual for guidance, care and maintenance of your appliance:

Download – Cooker Hood – Beko HNU51312 – User Manual

It is the occupier’s responsibility to ensure the cooker hood filter is cleaned regularly for optimum efficiency. It is also the responsibility of the occupier to ensure that the bulbs within the cooker hood are replaced should they fail.

Fridge Freezer

The property is fitted with a Beko Combi Built-in Fridge Freezer that is covered by a 2-year manufacturer’s warranty. Please see the below PDF version of the user manual for guidance, care and maintenance of your appliance:

Download – Combi Fridge Freezer – Beko BCFD173 – User Manual

The fridge freezer should be defrosted twice a year or when a frost layer of around 7mm has formed in order to maintain an excellent working condition and to prevent the build-up of ice. When de-frosting the fridge freezer, please ensure that there is no resting water on the housing unit as this will cause damage. It may be advisable to protect the unit with dry clothes/towels to avoid this from happening.

Please see the below link for further troubleshooting information from Beko:

www.beko.co.uk/support/how-to-guides/refrigeration

All warranty issues should still be logged with SevenCapital.

Washer-Dryer

The property is fitted with a Beko Washer-Dryer that is covered by a 2-year manufacturer’s warranty. Please see the below PDF version of the user manual for guidance, care and maintenance of your appliance:

Download – Washer-Dryer – Beko WDR7543121 – User Manual

It is the occupier’s responsibility to ensure that the filter in your washer-dryer is regularly checked and kept clean. Filters must be cleaned whenever the pump filter is clogged or in every 3 months.

Please see the below links for further troubleshooting information from Beko:

www.beko.co.uk/support/how-to-guides/washing-machines

www.beko.co.uk/support/how-to-guides/tumble-dryers

All warranty issues should still be logged with SevenCapital.

Dishwasher

The property is fitted with a Beko Dishwasher that is covered by a 2-year manufacturer’s warranty. Please see the below PDF version of the user manual for guidance, care and maintenance of your appliance:

Download – Dishwasher – Beko DIN15310 – User Manual

Please see the below link for further troubleshooting information from Beko:

www.beko.co.uk/support/how-to-guides/dishwashers

All warranty issues should still be logged with SevenCapital.

Lifts – The Metalworks

The lifts are located near the main entrances of each blocks within the development.

Lift doors must not be wedged open or held for any period, as this can cause them to malfunction. Please take the appropriate precautions when transporting large and bulky items such as furniture within the lifts; in order to prevent damage from being caused. In the event of a fire, please do not use the lifts and descend using the nearest stairway.

If you experience any issues within the lifts, then please dial the emergency number using the internal lift alarm instructions or contact the Managing Agent, Centrick, without delay. Any general maintenance issues with the lifts should be reported to the Managing Agent, Centrick.

Local Information – The Metalworks

Slough is currently the focus of substantial investment through the £450m Heart of Slough regeneration programme. Thanks to the vision of the programme, which includes improved leisure facilities and increased commercial space, the town is emerging as the perfect place to live, work and play.

Slough has a long-standing reputation for excellent employment opportunities. This thriving town is home to the highest concentration of global corporate headquarters outside London, including Nintendo, Amazon and Mars, who manufactured the very first Mars Bar in the town back in 1932. The developments location close to this booming business community in the heart of the M4 Thames Valley corridor and just a stone’s throw from Slough station, with direct access to London, Reading and Oxford, make it perfectly positioned for those looking to work close to home and commuters alike.

Kitchen – The Metalworks

Original Joinery have fitted the kitchens at The Metalworks. The kitchens are fitted with integrated appliances which include: a built-in oven, built-in hob, cooker hood, dishwasher, washer-dryer and fridge freezer.

The kitchen sink is a Reginox Comfort L18 3440 OKG Stainless Steel Integrated Kitchen Sink and is fitted with a Hansgrohe Tap. Kitchens comprise of matt wall and base units in a combination of the colours Egger Stone Grey and Egger Cashmere Grey, a Silestone Calacatta worksurface and stainless-steel splashback behind the built-in hob.

The built-in oven, built-in hob, cooker hood, dishwasher, washer-dryer and fridge freezer are controlled by an isolation switch or spur sockets. Please ensure that these are switched on before you attempt to use any of these appliances. Please also ensure that all appliance packaging is removed prior to use.

Care Information

When cleaning your kitchen there are several factors to consider. It should only be necessary to use a damp cloth with a little liquid detergent to remove most marks. Excess water, especially around the corner joints and front edge of the work surfaces should be removed immediately as constant water ingress can cause irreversible damage which is not covered by the warranty.

Avoid boiling kettles over or near work surface joints or under wall cupboards. Microwaves, toasters, steamers or any other heat-generating appliance should not be positioned over or near a work surface joint. Please do not place hot pans directly onto the work surfaces as they are not heat-resistant and can cause staining or damage.

Bathroom – The Metalworks

The bathroom and en-suite bathroom (if applicable) are fitted with tiling surrounding the bath/shower, wash basin and toilet. A mirror has also been installed above the wash basin as part of the specification.

The bathrooms comprise of a thermostatic shower over bath, dual flush function cistern and wash basin with a wall hung vanity unit including storage drawers. The en-suite bathrooms (if applicable) comprise of a thermostatic shower enclosure with a monsoon shower fitting in addition to the shower head, dual flush function cistern and wash basin pedestal.

Please ensure shower screens are aligned with the top of the bath before showering in order to prevent water from spilling over the edge of the bath. Any water damage caused as a result of improper use is not covered under warranty. Do not remove shower screen seals, as these are in place to prevent leaks or water spillages whilst showering. Excess water should be dried after showering in order to prevent water marks.

 

Bicycle Racks – The Metalworks

The bicycle stores are located externally to both blocks on the ground floor of the development. Please contact the Managing Agent, Centrick, for further details.